Author: National Development and Reform Commission of the People's Republic of China
Publisher:
Publish Date: 2005-06-28
Features: This standard specifies the principles, work procedures, work content, work depth, and report writing requirements that hydroelectric engineering preliminary feasibility study reports should follow. This standard applies to the preparation of preliminary feasibility study reports for new construction and expansion of medium and large-sized hydropower stations and pumped storage power stations.
Hydraulic and Electrical Engineering Preliminary Feasibility Study Report DL/T 5206-2005
📌 Related Posts
Literature
Nietzsche: Ten Lectures
2026-09-22
Literature
Comprehensive Practical Activity Case Expert Reviews · Overseas Volume
2026-10-01
Literature
China's economic growth and power investment
2026-10-03
Literature
Visual C++ Tutorial
2026-10-07
Literature
National unified installation project construction instrument and equipment per shift cost quota
2026-10-11
Literature
Thermal Measurement and Instrumentation (Second Edition) (University Textbook)
2026-10-11
Literature
Woodworking Small Handbook (Worker Small Handbook Series)
2026-10-11
Literature
Architecture Design Series Building Group Design
2026-10-11