Author: China Electric Power Enterprise Association (Editor-in-Chief)
Publisher: China Planning Press
Publish Date:
Features: This specification was revised based on the requirements of the document Construction Construction Standard [2002] No. 85, "Notice on Issuing the 'Plan for Formulation and Revision of National Engineering Construction Standards for the 2001-2002 Annual Plan'" in accordance with the document "Notice on Issuing the 'Plan for Formulation and Revision of National Engineering Construction Standards for the 2001-2002 Annual Plan'." Compared to the original specification, the revised version has removed certain provisions such as casting alloy anchor head guy wires and the requirement that the main steel of the main steel insert foundation should be assembled with the tower structure for alignment. For difficult-to-inspect items, such as varying requirements for the compaction density of backfill in foundation pits, simplified treatment has been applied. The following new content has been added: 1. Pile foundation engineering and winter construction in foundation engineering; 2. Steel pole construction in pole tower engineering; 3. Optical cable laying construction in line construction; 4. Completion handover regulations in project acceptance and handover.
110~500KV Overhead Transmission Line Construction and Acceptance Code GB50233-2005
📌 Related Posts
Literature
Old House - Tujia Diao Jiao Lou
2026-09-14
News
Will traffic cause infertility in the future?
2026-09-28
Literature
Computer-Aided Interior Designer
2026-09-30
Literature
Statistical Inference (English Edition. Second Edition)
2026-10-06
Literature
Civil Engineering Materials
2026-10-10
Literature
Construction Project Bill of Quantities Pricing Specification GB50500-2003
2026-10-10
Literature
Newly Compiled Budget Manual for Plumbing and Heating Engineering (Second Edition)
2026-10-10
Literature
National unified construction and installation engineering durationcalculationmethodandusage
2026-10-10