Author: Acceptance Code for Construction Project of Wind Power Generation Project DLT5191-2004
Publisher:
Publish Date: 2004-06-01
Features: This standard specifies the acceptance procedures for four stages in the construction project of a wind power generation project: completion of unit engineering, engineering start-up commissioning, engineering handover for production, and project completion. This standard is applicable to the acceptance of new (expansion) construction projects of wind power generation projects with an installed capacity of 5 MW or more. The acceptance of construction projects of wind power generation projects with an installed capacity of less than 5 MW can refer to this standard for implementation.
Wind farm project construction project acceptance specification DL/T5191-2004
📌 Related Posts
Literature
Study New Concept English 4
2026-09-20
Literature
Research on Group Company's Centralized Treasury Management
2026-09-24
Literature
Measurement System Analysis
2026-09-25
Literature
Dreamland: Photoshop Image Design ((Includes one CD-ROM disc) - Practical Exercise Series)
2026-09-25
Literature
Gaokao Second Round Navigation · English
2026-09-26
Literature
History of Diplomacy of the New China
2026-09-26
Literature
Technical Specifications for Organic Food HJ/T 80-2001
2026-09-26
Literature
Indoor Air Quality Standard GB/T 18883-2002
2026-09-26