Author: Editorial Team of the Series
Publisher:
Publish Date: 2006-04-01
Features: This book mainly includes the following content: installation of overhead insulated lines below 10kV, layout of transformer rooms and equipment component installation, installation of dry-type transformers, secondary wiring of substation and distribution stations, plastic cable trough installation, metal cable trough installation, pipeline laying, and lighting fixture installation, etc.
National Building Standard Design Atlas Budget Engineering Quantity Series: Electrical and Low-Voltage Sub-series
📌 Related Posts
News
What should I do if I have some symptoms of autism?
2026-09-19
Literature
Fishing Techniques for Reservoirs and Lakes
2026-09-25
Literature
Freedom and Flight - My Youthful Journey with Guo Jingming
2026-10-05
News
How should premature ejaculation be treated?
2026-10-07
Literature
Headlight D.2
2026-10-16
Literature
Stories of the Four Great Civilizations of the World
2026-10-16
Literature
Headlight D.4
2026-10-16
Literature
Golden Egg Laying Duck: Teach You Smart Saving
2026-10-16