Water conservancy tunnel construction and quality control

Author: Wang Yongxing
Publisher:
Publish Date: 2006-07-01
Features: This book systematically elaborates on the key points of construction management and quality control for hydraulic tunnel projects, comprising a total of 10 chapters. The specific content includes tunnel construction organization design, tunnel construction survey control, technical requirements for tunnel excavation, quality control of initial lining and support, quality control for tunnel construction in poor and special geological sections, quality control for new Austrian tunneling (NATM) construction, dynamic management during tunnel construction, quality inspection and final acceptance of tunnel support, on-site monitoring and measurement of tunnels, and environmental control during tunnel construction. This book is a practical science and technology reference, suitable for personnel engaged in the design, construction, management, and supervision of hydraulic tunnels, as well as serving as a teaching reference for students and faculty in water conservancy-related undergraduate, junior college, and vocational college programs.

📌 Related Posts