China Highway Society, Branch of Bridge and Structural Engineering, 2005 National Bridge and Structure Academic Conference Proceedings

Author: Hangzhou Bay Bridge Project Command, Bridge and Structural Engineering Branch of China Highway Society
Publisher:
Publish Date: 2005-10-01
Features: The Nanjing Third Yangtze River Bridge is a key project on the Shanghai-Chengdu National Highway, crossing the Yangtze River. The main bridge is a steel cable-stayed bridge with a steel box girder and double cable planes, spanning five continuous spans. The book "Technical Summary of the Main Bridge of Nanjing Third Yangtze River Bridge" is divided into eighteen chapters. The content includes:
General overview of the project;
Riverbed hydrogeology in the main bridge area;
Design of main pier foundations;
Fabrication and transportation of steel cofferdams for the south main pier foundation;
Construction of deep-water high-pile caps for the south main pier;
Construction of the north main pier foundation;
Structure of the cable towers;
Construction of lower tower columns and lower cross beams;
Fabrication of steel cable towers;
Installation of steel cable towers at the bridge site;
Auxiliary piers and transition piers;
Cable stays;
Steel box girder and main auxiliary structures;
Steel deck pavement;
Construction surveying;
Construction control;
Hydrodynamic characteristics study of the steel cofferdam water flow for the south main pier;
Protection and monitoring of the south bank slope during construction period.
This book provides valuable references for bridge design, construction, and research. It can also serve as a reference for engineering technicians in related fields.

📌 Related Posts