Author: Water Conservancy Construction Economy Station of the Ministry of Water Resources
Publisher:
Publish Date: 2002-06-01
Features: "Budgetary Quotas for Water Conservancy Construction Projects," divided into nine chapters and an appendix: Earthwork, Masonry Work, Concrete Work, Formwork, Sand and Gravel Preparation, Boring and Grouting, Anchoring, Dredging, and Other Works.
This quota is applicable to large and medium-sized water conservancy projects and serves as the foundation for compiling "Budgetary Quotas for Water Conservancy Construction Projects." It can be used as a reference for preparing bid bases and bid quotations for water conservancy projects.
This quota is applicable to projects in areas with an elevation of less than or equal to 2,000 meters above sea level. For areas with an elevation greater than 2,000 meters, the calculation should be based on the elevation of the water conservancy structure and the specified adjustment coefficient.
Water Conservancy and Hydraulic Engineering Construction Budget
📌 Related Posts
Literature
Hegeman and his students
2026-09-25
Literature
Manso friend
2026-10-02
Literature
Teenage Mutant Ninja Turtles: The Second Series, Part 1, consisting of three volumes
2026-10-01
Literature
Protel 99 SE Design Expert Guide
2026-09-22
Literature
Xinxiang City Water Conservancy Chronicle
2026-10-01
Literature
Village Governance and Clan: A Survey and Study of Nine Villages
2026-10-01
Literature
Dictionary of Idioms Usage
2026-10-01
Literature
The Yellow River flows through the land.
2026-10-01