Author: Yellow River Conservancy Commission of the Ministry of Water Resources
Publisher:
Publish Date: 2004-01-01
Features: The main basis for the preparation of this plan includes: "Major Issues and Countermeasures of the Yellow River," "Yellow River's Near-Term Key Governance and Development Plan," "Five-Year Plan Outline for the Reform and Development of the Yellow River Conservancy Commission," "Digital Yellow River Project Plan," as well as relevant technical codes and standards such as "Regulations on River Training Model Experiments," "Technical Regulations on Coastal and Estuarine Tidal Current and Sediment Simulation," and "Technical Standards for Real-Time Monitoring Information Collection in Hydraulic Engineering." The main content of the "Model Yellow River Project Plan" includes: necessity and feasibility of project construction, demand analysis, planning objectives and tasks, composition and layout of the model system, infrastructure construction, monitoring and control system construction, thematic research, supporting measures, implementation arrangements, and analysis of roles and benefits.
"Model Yellow River" Project Planning
📌 Related Posts
Literature
Auction Information Book of Folk Collections -- Bamboo Ware
2026-09-19
Literature
Tchaikovsky
2026-09-30
Literature
National Unified Examination for German Language Proficiency for Applicants with Equivalent Academic Qualifications Seeking Master's Degrees
2026-09-29
Literature
National Real Estate Broker Qualification Examination Practice Test
2026-09-23
Literature
Research on the operation mode of Sanmenxia Reservoir during the early stage of Xiaolangdi Reservoir utilization
2026-10-01
Literature
Visual Basic Surveying Program Design
2026-10-01
Literature
Lushun Massacre
2026-10-01
Literature
Nanjing Ming Dynasty City Wall
2026-10-01