National Unified Installation Engineering Budget. Volume 3, Heating Equipment Installation Engineering GYD-203-2000

Author: Former Ministry of Power Industry
Publisher:
Publish Date: 2001-07-01
Features: The "National Unified Installation Engineering Budget (GYD-203-2000) (Volume 3): Installation Engineering of Thermal Equipment (2nd Edition)" is approved by the Ministry of Construction of the People's Republic of China. This volume is applicable to the installation engineering of steam turbine generator units with an output of less than 25MW and boiler equipment with an output of less than 130t/h in new construction and expansion projects. It includes six parts: installation of medium-pressure boiler equipment, installation of steam turbine generator equipment, installation of fuel supply equipment, and installation of water treatment specialized equipment.

📌 Related Posts