Author: Former Ministry of Power Industry
Publisher:
Publish Date: 2001-07-01
Features: The "National Unified Installation Engineering Budget (GYD-203-2000) (Volume 3): Installation Engineering of Thermal Equipment (2nd Edition)" is approved by the Ministry of Construction of the People's Republic of China. This volume is applicable to the installation engineering of steam turbine generator units with an output of less than 25MW and boiler equipment with an output of less than 130t/h in new construction and expansion projects. It includes six parts: installation of medium-pressure boiler equipment, installation of steam turbine generator equipment, installation of fuel supply equipment, and installation of water treatment specialized equipment.
National Unified Installation Engineering Budget. Volume 3, Heating Equipment Installation Engineering GYD-203-2000
📌 Related Posts
Literature
Propaganda Techniques in World War I (Contemporary World Academic Classics, Translation Series of Journalism and Communication, Master Classics Series)
2026-09-20
Literature
Peony Pavilion
2026-09-29
Literature
Curtain Ceremony (Bedroom Edition)
2026-09-14
Literature
Research on Safeguard Measures Law: Theoretical Framework and Empirical Analysis: Theoretical Framework and Empirical Analysis
2026-09-25
Literature
Journal of Asian Folklore Studies (Issue 3)
2026-10-01
Literature
Towards Poetry of Philosophy
2026-10-01
Literature
Raising Children in Three Characters
2026-10-01
Literature
Polyphonic Polysemous Chinese-English Dictionary
2026-10-01