Author: Editorial Committee of "Design and Calculation Methods for Industrial Boilers"
Publisher:
Publish Date: 2005-08-01
Features: In accordance with the World Bank project execution procedures, the PMO selected 9 main equipment manufacturers and 10 auxiliary equipment manufacturers nationwide in the industrial boiler industry through an open bidding process as technology introduction units. These enterprises were approved to use GEF grants to import advanced product design drawings and key manufacturing equipment from companies in countries such as the United States, the United Kingdom, Germany, Denmark, and others ("technology sources"), thereby enhancing the technical level of main equipment, combustion equipment, auxiliary equipment, and automatic control devices for boilers. New product structures, design concepts, calculation models, and methods related to industrial boilers from foreign countries were introduced simultaneously. To ensure the effectiveness of the project and to promote the entire industrial boiler industry, the PMO established several technical assistance sub-projects (TA) in the project, proposing 9 projects for the formulation or revision of industrial boiler standards. The design and calculation methods and thermodynamic testing procedures included in this book are listed among them.
Industrial boiler design calculation methods
📌 Related Posts
Literature
Farewell with sincerity
2026-09-23
Literature
Environmental Art and Design Rendering Explanation
2026-09-19
Literature
Modern Dangers
2026-09-23
Literature
Corporate Financial Analysis -- Principles and Applications
2026-09-13
Literature
Introduction to Pharmaceutical Management
2026-09-30
Literature
College English - Book 1
2026-09-30
Literature
Human anatomy and physiology
2026-09-30
Literature
Pharmaceutical Management
2026-09-30