Cable-stayed bridge: Construction of Runyang Bridge

Author: Ou Qingji
Publisher:
Publish Date: 2005-05-01
Features: The northern branch cable-stayed bridge of the Runyang Yangtze River Highway Bridge is a twin-tower, dual-cable-plane steel box girder cable-stayed bridge, with high technical content and significant difficulty in its design, construction, and construction control technology. This volume provides a detailed introduction to the design and construction-related technical content of the cable-stayed bridge. The entire volume is divided into three parts. Part 1 consists of four chapters, primarily introducing design conditions, overall design, conceptual design, foundation design, tower pier design, steel box girder design, cable design, and construction control; Part 2 consists of three chapters, primarily introducing the production, processing, transportation, and on-site welding technology of the steel box girder; Part 3 consists of three chapters, primarily introducing the organization and management, as well as key technologies in the on-site construction of the cable-stayed bridge, such as deep-water foundation construction, abutment construction, tower construction, deck crane installation, steel box girder segment hoisting and splicing, and cable installation and erection. This book is suitable for engineering technical personnel engaged in the design, construction, supervision, and construction management of large-scale bridges, as well as for students of bridge engineering and other related disciplines in colleges and universities.

📌 Related Posts