Author: China Power
Publisher:
Publish Date: 2005-03-01
Features: This regulation consists of 10 chapters, including General Provisions, Technical Measures for Ensuring Safety, Line Operation and Maintenance, Work Near Live Conductors, General Safety Measures, Work on Distribution Equipment, Live Work, Use, Storage, Inspection, and Testing of Construction Tools and Safety Tools, and Power Cable Work. The appendix also provides content such as various types of work permits, signs, and emergency first aid methods. This regulation came into effect on March 1, 2005. It applies to personnel working on power generation, transmission, distribution, and user electrical equipment (including construction, installation, and rural power personnel). Relevant units and personnel are referred to for implementation.
State Grid Corporation of China Power Safety Work Regulation (Substation and Power Plant Electrical Part) (Trial Implementation)
📌 Related Posts
Literature
Diagnosis and Prevention of Turtle Diseases (Colored Illustrations Explained)
2026-09-12
Literature
Applied Statistics (Second Edition)
2026-09-14
Literature
On the way
2026-09-24
Literature
Sweet potato food processing technology
2026-09-22
Literature
Railway Construction Management Regulations Document Collection
2026-09-26
Literature
Specification for Maintenance Technology of Highway Concrete Pavement JTJ 073.1-2001
2026-09-26
Literature
Fuzzy Mathematics Basics and Practical Algorithms
2026-09-26
Literature
J2ME Programming Tutorial
2026-09-26