Features: This standard specifies the principles and construction standards that should be followed in the design of ash removal systems for large thermal power plants. This standard applies to the ash removal design of condensing steam power plants with steam turbine generator unit capacity of 125MW or higher, as well as to the ash removal design of thermal power plants with heating capacity of 50MW or higher and power plants using clean coal generation technology. This standard is applicable to the ash removal design of newly built or expanded power plants, and the ash removal design of renovation projects can be referenced for use.
Power Plant Ash Handling Design Specification DL/T5142-2002
📌 Related Posts
Literature
Contemporary Master's Fine Brush Portraits·He Jiaying
2026-09-20
Literature
Degas: Dances with Shadows
2026-09-22
Literature
Research on Qing Dynasty's Policy towards Tibet
2026-09-21
Literature
Japanese Language Proficiency Test -- Countermeasures for Level 3.4 Written and Vocabulary Examination
2026-09-15
Literature
Electrical Part, Volume 2: Power Systems and Substations
2026-09-23
Literature
High-voltage line live maintenance
2026-09-23
Literature
Vocational Skill Job Standard Vocational Skill Job Assessment Specification Vocational Skill Job Assessment Question Bank Sewer Worker
2026-09-23
Literature
Kaolinite JC/T 929-2003
2026-09-23