Author: China Railway Third Survey and Design Institute
Publisher:
Publish Date: 2000-03-01
Features: This book mainly introduces the construction procedures and commonly used calculation methods for laying rails using bridge erecting machines, rail laying machines, and other rail-laying equipment on standard-gauge railways with a train speed of 140 km/h or less.
Railway Bridge Erecting Machine Beam Installation Manual
📌 Related Posts
Literature
Rationality and Irrationality in Marriage and Family
2026-10-02
Literature
Dear Mr. Hanxiu
2026-10-06
News
Which hospital is better for treating benign prostatic hyperplasia?
2026-10-07
News
Is medication or surgery more effective for treating prostatitis?
2026-10-07
Literature
Harvest -- Selection of Long Novels
2026-10-19
Literature
Postgraduate Entrance Examination Guide for Professional Master's Degree Programs (2004 Edition)
2026-10-19
Literature
One hundred and twenty million Martians, sixty million turkey people
2026-10-19
Literature
Market Economy: China Case
2026-10-19