Experience Compilation of Construction of Phase III of the Taishan Heavy Water Reactor Nuclear Power Station. Volume 2, Technical Improvements and Design Reviews

Author: Tsinghua Third Nuclear Power Co., Ltd.
Publisher:
Publish Date: 2003-08-01
Features: "The Construction Experience Compilation of Qinshan III PWR Nuclear Power Plant (Technical Improvements and Design Reviews) (Exquisite Edition)" is published and distributed by the Atomic Energy Press. The "Construction Experience Compilation of Qinshan III PWR Nuclear Power Plant" is divided into 4 volumes: Volume 1 - Comprehensive Management, Volume 2 - Technical Improvements and Design Reviews, Volume 3 - Engineering Construction, and Volume 4 - Commissioning and Production. This book is Volume 2, which includes 62 articles written by experts from Tsinghua Third Nuclear Power Co., Ltd. and the technical support unit Shanghai Nuclear Engineering Research and Design Institute. It provides a detailed introduction to the successful experiences in safety reviews, design reviews, and technical improvements during the construction process of the Qinshan III PWR nuclear power plant. This book can serve as a reference for those engaged in nuclear power engineering and similar projects.

📌 Related Posts