Author: Qinshan Third Nuclear Power Co., Ltd.
Publisher:
Publish Date: 2003-08-01
Features: "Compendium of Construction Experience of Qinshan Phase III Heavy Water Reactor Nuclear Power Plant" is divided into 4 volumes: Volume 1 covers comprehensive management, Volume 2 covers technical improvement and design review, Volume 3 covers engineering construction, and Volume 4 covers commissioning and production. This book is Volume 4, which includes 75 articles on 7 aspects: commissioning and production management, commissioning, operation, equipment and maintenance, radiation protection and safety, chemistry, and training. It summarizes important or typical technical and technical management matters in the commissioning and production field of Qinshan Phase III. This book can be used as a reference for builders and managers engaged in nuclear power engineering.
Experience Compilation of Construction of Phase III Heavy Water Reactor Nuclear Power Plant in Taishan. Volume 4, Commissioning and Production
📌 Related Posts
Literature
A Comparison of Public Sector Reform in the UK and Germany: Major Traditional and Modernization Trends
2026-09-25
News
Will breastfeeding naturally stop if it is not fed?
2026-09-29
News
Which hospitals can men consult for infertility?
2026-10-01
Literature
New Horizons College English Tutoring Materials 3
2026-10-10
Literature
Greenhouse cucumber cultivation without pesticides
2026-10-12
Literature
Research Series on Hydrocarbon Reservoir Formation Mechanisms (Volume 4) - Hydrocarbon Generation, Migration Mechanisms, and Models
2026-10-12
Literature
Exploration in China's Oil and Gas New Area. Volume 2, New Areas for Onshore Natural Gas Exploration in China
2026-10-12
Literature
Design and Implementation of Gas Storage
2026-10-12