Steam Generator Volume (600MW Thermal Power Generation Unit Installation Operation Series)

Author: Wang Jianzhong et al.
Publisher:
Publish Date: 2006-06-01
Features: This book is one of the "Installation Operation Series for 600MW Thermal Power Generation Units," which consists of four volumes: the Boiler Volume, the Steam Turbine Volume, the Electrical Volume, and the Thermal Control Volume. This book is the Boiler Volume. It is divided into six chapters, providing a very detailed description of the boiler installation work for 600MW units, reflecting the entire process of boiler installation. Chapter provides a comprehensive introduction to the boiler system, while Chapters 2 to 5 describe in detail the installation processes of the steel structure, main body, and auxiliary equipment of the 600MW unit's boiler. Chapter 6 introduces the methods and content for compiling the professional construction organization design for 600MW unit boilers. Since the content of this book is based on the actual experience and construction methods of the 600MW unit boiler installation site, it has high reference value and serves as a strong guide and reference for the installation process of 600MW unit boilers. The content of this book is comprehensive and detailed, integrating theory and practice, making it highly practical and operational. It is an invaluable reference book for engineering technicians in thermal power construction enterprises to compile construction operation guides and direct construction personnel.

📌 Related Posts