Author: Wang Huasheng et al.
Publisher:
Publish Date: 2002-09-01
Features: This book is written from the perspective of construction engineering supervision personnel, comprehensively introducing the basic knowledge of on-site supervision and focusing on the "three controls" for on-site supervisors, namely quality control, schedule control, and investment control; as well as the "two management" aspects, namely contract management and information management. The book also highlights the quality supervision during the construction phase of divisional projects and provides an overview of quality supervision during the construction phases of highways and railways. The content of the book is comprehensive and highly practical. It serves as a guide for construction engineering supervision personnel and engineering technical personnel of construction units, as well as a reference source for relevant management personnel and university teachers and students.
How to Be a Good On-site Supervisor (Construction Project Management Series)
📌 Related Posts
News
How to deal with poor follicular development?
2026-10-01
News
Taking medication for low libido and weak erection, how to treat weak erection?
2026-10-02
News
What should I do if I have a fever in the early stages of pregnancy?
2026-10-04
News
Many small bumps have grown on the labia, and they sometimes itch.
2026-10-05
Literature
"Contract Protection Umbrella" (Labor Dispute Easy Solution Series)
2026-10-11
Literature
Analysis of the system's investment philosophy
2026-10-11
Literature
Restaurant and Residential Design Expert · Hong Yuze (World Interior Designer Series / Asia Edition / Hong Kong Issue)
2026-10-11
Literature
Casing and Insulator (Part 5) - Power Equipment Preventive Test Technology Series
2026-10-11