II. Basic Knowledge of Safe Operation
1. In the circuit of a dedicated transformer neutral point directly grounded at the construction site, the factory N-S grounding protection system must be used.
2. The start, middle, and end of power supply lines at the construction site must be repeatedly grounded. Repeated grounding must be performed in areas with concentrated equipment (e.g., batching sheds, steel bar working areas) or at high-elevation equipment (e.g., tower cranes, external elevators, material hoists).
3. The metal casing of electrical equipment must be protected with grounding.
4. In the same power supply system, it is not allowed for some equipment to be grounded while others are protected with N-S grounding.
5. The insulation of all electrical equipment and circuits at the construction site must be in good condition, and connections must not be exposed.
6. When indoor lighting is less than 2.5 meters above the ground and outdoor lighting is less than 3 meters above the ground, the power supply voltage should not exceed 36 volts.
7. Handheld lighting (work lights) should use a safety voltage of no more than 36 volts. In damp or easily accessible areas with live electrical parts, lighting should use a safety voltage of less than 24 volts. In particularly damp areas, areas with good electrical conductivity, or inside metal containers, lighting should use a voltage of no more than 12 volts.
8. The distance between tungsten halogen lamps, spotlights, and flammable materials should not be less than 500 millimeters, and they must not directly illuminate flammable materials. If the requirements are not met, heat insulation measures must be taken.
9. Tungsten halogen lamp power cables should use three-core rubber-insulated cables. For outdoor use, rainproof measures must be provided. Insulation must be installed on the handle of mobile brackets, and the casing must be grounded.
10. The main distribution box should be placed near the power source. The sub-distribution box should be placed in areas with relatively concentrated power consumption equipment or loads. The distance between the sub-distribution box and the switch box must not exceed 30 meters.
11. There must be enough space and passage for two people to work simultaneously around the switch box, with a fence and rainproof measures. No should be stacked around the box.
12. A leakage protector must be installed in the switch box, with a rated leakage action current not exceeding 30 milliamperes and a rated leakage action time not exceeding 0.1 seconds. Splash-proof leakage protectors must be installed in outdoor, damp, corrosive environments, or when operating on metal structures.
13. Handheld electric tools must be equipped with leakage protectors with a rated leakage action current not exceeding 15 milliamperes and a rated leakage action time not exceeding 0.7 seconds.
14. Switch boxes must be installed around the controlled power-consuming equipment and in easily accessible locations. The horizontal distance between the switch box and the fixed power-consuming equipment it controls must not exceed 3 meters.
15. The vertical distance from the center of a fixed distribution box to the ground should be 1.4–1.6 meters. The vertical distance from the center of a mobile distribution box to the ground should be 0.8–1.6 meters.
16. When a distribution cabinet or power supply line is shut down for maintenance, grounding wires must be installed, and a "No Power On—Work in Progress" sign must be hung. Power shutdown and restoration must be handled by designated personnel.
Electrician (Basic Knowledge of Safe Operation for Construction Workers)
📌 Related Posts
Literature
From Westernization to Globalization
2026-09-28
News
How is hydrosalpinx treated effectively?
2026-09-29
News
Can pregnant women take Cefixime dispersible tablets?
2026-10-05
Literature
Thomson English Vocabulary Advanced Training (Intermediate)
2026-10-10
Literature
Urban Construction Project Quality Common Fault Prevention and Treatment Manual
2026-10-11
Literature
The Future of Europe - Forward-Thinking Considerations on Environmental Design in Post-Industrial Societies
2026-10-11
Literature
Regional Suburban Development Based on the Whole Region - Implications of Paris's Regional Practices for Beijing
2026-10-11
Literature
Yangzhou City Tourism Development Master Plan (2002-2020)
2026-10-11