Heating, Ventilation, and Air Conditioning Technology Manual Design · Construction · Commissioning · Management

Author: Jin Lian et al.
Publisher:
Publish Date: 2000-07-01
Features: This manual consists of three parts. The first part is "Design, Construction, and Commissioning of Cleanrooms," which summarizes the design, construction, and commissioning of various types of medical biological cleanrooms. It explains the fundamental principles of cleanroom design and construction from a theoretical perspective, and also elaborates on the preparation of design documents, technical measures, and specific issues encountered during construction and commissioning. The second part is "Air Conditioning Design, Construction, and Commissioning for Libraries," which, in addition to discussing technical measures for library design, also addresses control standards and solutions for indoor air parameters in libraries. The third part is "Construction Management Technology for Heating, Ventilation, and Air Conditioning (HVAC)," which is composed of three sections: the preparation of construction organization design, on-site construction quality management, and construction technical document management. It focuses on summarizing the technical management issues throughout the entire construction process of heating, ventilation, and air conditioning.

📌 Related Posts