Author: National Development and Reform Commission of the People's Republic of China
Publisher:
Publish Date: 2004-06-01
Features: This standard specifies the technical requirements for the commissioning of main units, auxiliary equipment, and thermal systems of steam turbines for new, expanded, and renovated thermal power generation units in basic power engineering construction projects. It also covers the commissioning of the entire unit start-up. This standard applies to domestically produced steam turbines with a capacity of 125 MW or higher, and the start-up commissioning of other types of steam turbine units may also refer to this standard for implementation. Imported units shall be commissioned according to the manufacturer's instructions. If the manufacturer does not provide specific instructions for this, this standard may also be referred to for implementation.
Steam Turbine Startup and Commissioning Guidelines DL/T863-2004
📌 Related Posts
News
A 14-year-old girl is experiencing severe hallucinations. Is it a symptom of psychosis? How should it be treated?
2026-09-22
Literature
Practical Chinese Map Atlas
2026-09-24
Literature
Word 2002 Chinese Edition Quick Start Guide
2026-10-07
News
How to treat inguinal lymphadenopathy
2026-10-09
Literature
State Grid Corporation of China Work Safety Award and Punishment Regulations
2026-10-10
Literature
Electrical Equipment Switching Operation Technology Q&A (Third Edition)
2026-10-10
Literature
China Power Industry Standard DL/T641-2005 Station Valve Electric Actuator
2026-10-10
Literature
Power Construction Construction and Acceptance Technical Specification Part 5: Thermal Automation DL/T 5190.5-2004
2026-10-10