Author: Science and Technology Committee of East China Electric Power Administration
Publisher:
Publish Date: 2000-01-01
Features: This book takes the perspective of comprehensive process management of equipment in thermal power plants and focuses on introducing the 600MW steam turbine units imported from abroad, especially the startup, commissioning, and operation technologies of 600MW ultra-supercritical steam turbine units. The main contents include: the main structures and technical features of four 600MW steam turbine units, their thermal systems, and auxiliary equipment; analysis and handling of major problems encountered during installation, startup, commissioning, and operation; routine startup and shutdown, medium-pressure cylinder startup, operating modes, parametric shutdown, and forced cooling of the units; comprehensive process management of the units, mainly including power plant design, equipment bidding and evaluation, startup and commissioning, operation management, reliability statistical analysis, steam turbine life management, unit performance evaluation, operational economy analysis and management, and prospects for achieving condition-based maintenance for the units. This book can serve as a reference for engineering technicians and management personnel involved in the installation, commissioning, and operation of new, under-construction, and existing 600MW+ units; it can also be used as teaching material for thermal power engineering majors in universities and colleges, as well as for engineering technicians in the steam turbine manufacturing industry.
Steam Turbine Volume
📌 Related Posts
Literature
Battle in the Blue Sky -- A Classic of Air Combat: A Classic of Air Combat
2026-09-20
Literature
Ancient pavilion and villa
2026-09-21
Literature
Newly Compiled Idioms 365
2026-09-24
Literature
University Textbooks: Object-Oriented Programming in C++
2026-10-07
Literature
Second Volume Power Transformers and Reactors
2026-10-10
Literature
State Grid Corporation of China Transmission and Distribution Engineering Construction Hazard Identification and Pre-control Measures (Trial)
2026-10-10
Literature
(Second Volume) Turbine Equipment and Systems
2026-10-10
Literature
Summary of Key Issues in Survey and Design of the Longyangxia Hydropower Station on the Yellow River (2)
2026-10-10