Author: Pan Shijian
Publisher:
Publish Date: 2002-01-01
Features: This book is the sixth volume of the "Xiamen Haicang Bridge Construction Series."
Part 1 introduces the plan layout, horizontal and vertical alignment design, superstructure and substructure, and drainage design of the Dongdu Interchange.
Part 2 covers the construction organization and management, superstructure and substructure construction, and crack treatment methods for prestressed concrete box girder of the Dongdu Interchange.
Part 3 presents the conceptual design, plan layout design, and superstructure and substructure design of the Shitang Interchange.
Part 4 details the construction organization and management, superstructure and substructure construction, and engineering testing of the Shitang Interchange (Phase I).
Part 5 covers the superstructure and substructure design of the east and west approach bridges.
Part 6 introduces the construction of the east and west approach bridges.
Part 7 discusses the construction supervision of the interchange.
This book serves as a reference for urban interchange engineering, approach bridge design, and construction personnel.
Interchange · Approach Bridge · Approach Road
📌 Related Posts
News
Can immunological infertility really be cured?
2026-09-29
News
I am a patient with adenomyosis, and I have stomach pain this time during my period.
2026-10-04
News
Can surgery be performed if the hernia does not come down?
2026-10-09
Literature
Cambridge European Economic History (Volume 7: Industrial Economy: Capital, Labor, and Enterprise - Part 2: The United States, Japan, and Russia)
2026-10-09
Literature
Audi A6 Car Construction, Operation and Maintenance
2026-10-10
Literature
Road Construction Testing and Inspection
2026-10-10
Literature
Bridge Inspection, Maintenance, and Strengthening: 100 Questions
2026-10-10
Literature
Concrete Pavement Construction and Construction Machinery
2026-10-10