Author: China Electric Power Enterprise Association (Editor-in-Chief)
Publisher: China Planning Press
Publication Date: 2005-10-01
Features: This specification was revised based on the requirements of the document Construction Construction Standard [2002] No. 85, "Notice on Issuing the 'Plan for the Formulation and Revision of National Engineering Construction Standards for the 2001-2002 Annual Plan'" and the previous specification "Construction and Acceptance Procedures for 110-500kV Overhead Transmission Line" GBJ233—90. Compared to the original specification, the revised version deletes certain provisions such as casting alloy anchor head guy wires and the requirement that the main steel of the insertable foundation for the main steel should be assembled with the tower structure for alignment. For difficult-to-inspect items, such as varying requirements for the compaction density of backfill in foundation pits, simplified treatment has been applied. The following new content has been added: 1. Pile foundation and winter construction in foundation engineering; 2. Steel pole construction in tower engineering; 3. Optical cable installation in line construction; 4. Completion handover provisions in engineering acceptance and handover.
110kV 500kV Overhead Transmission Line Construction and Acceptance Specification
📌 Related Posts
News
Newborn jaundice rebound after blue light therapy, can it be treated again?
2026-09-19
News
Which professional face paralysis hospital is good?
2026-09-19
News
Do you have any questions about whether menstrual irregularities affect pregnancy?
2026-10-01
Literature
Beautiful Notes
2026-10-04
Literature
O'Neal Collection - (Complete 6 Volumes)
2026-10-06
Literature
Histology and Embryology Laboratory Guide
2026-10-06
Literature
Giant Panda Ex-situ Conservation: Theory and Practice
2026-10-06
Literature
Introduction and Selected Readings on Important Works of Chinese History - Volume 2
2026-10-06