Features: In the past decade, a large number of local power plants, industrial self-provided power plants, and thermal power plants with 6 to 100 MW thermal power generation units have been put into operation. The number of new employees and production personnel in operational positions has rapidly increased. To improve the technical training and skill assessment of operational and production personnel, experts have comprehensively revised and published the second edition of the "Technical Skill Assessment Question Bank for Local Power Plant Operators" (Second Edition), in accordance with the Ministry's "National Occupational Skill Assessment Specification for the Power Industry," "Technical Skill Level Standards for Power Workers," and "Operational Position Standards for Thermal Power Plants," as well as operational procedures. The content highlights key operational skills, focuses on practical skills, and facilitates assessment and training. The question bank is divided into five volumes: Boiler Operation, Steam Turbine Operation, Electrical Operation, Thermal Control and Operation, and Power Plant Chemistry, and is designed to be used in conjunction with the "Operational Training Textbooks for Local Power Plant Positions" (Second Edition). This book is the "Technical Skill Assessment Question Bank for Local Power Plant Operators (Second Edition)" (Electrical Operation), divided into four chapters. It includes:
- Basic knowledge of electrical and electronic technology
- Power plants and power systems
- Electrical equipment of 6 to 100 MW thermal power generation units, such as generators, excitation machines, motors, transformers, circuit breakers, disconnectors, current transformers, reactors, arc suppression coils, fuses, capacitors, insulators, busbars, cables, lightning arresters, distribution equipment, and low-voltage electrical appliances, covering principles, operational procedures, and accident handling.
- Electrical secondary circuits, relay protection and automatic devices, principle wiring, and safety knowledge for electricity use.
The content is extensive and focused, organized according to the three skill levels—initial, intermediate, and advanced—for electrical (substation) assistant shift operators, electrical (substation) shift operators, and electrical shift supervisors (electrical assistant shift supervisors). The questions are divided into six types: fill-in-the-blank, true/false, multiple-choice, drawing, calculation, and short-answer questions, with answers provided.
This book serves as the basis for the skill and occupational skill training, assessment, and technical skill level promotion for production personnel, workers, technicians, management personnel, and relevant teaching and research staff in local power plants, industrial self-provided power plants, and thermal power plants with 6 to 100 MW thermal power generation units, as well as for those with high school or higher education backgrounds in electrical-related fields.
Electrical Operation - Local Power Plant Operator Technical Level Assessment Question Bank (Second Edition)
📌 Related Posts
Literature
Renowned Chinese Economists: Theories of Commodity Economy and Market Economy
2026-09-25
News
What should be done to ensure safety when suffering from gestational diabetes?
2026-09-29
News
How long after MRI does sperm return to normal?
2026-09-29
Literature
Zodiac Sheep
2026-10-01
Literature
Collection of Papers on Urban Development and Planning in China - First International Conference on Urban Development and Planning in China
2026-10-05
Literature
Uncle Long Legs - Leading Primary School Students One Step Ahead in Reading Classics
2026-10-05
Literature
Research on the Risks of Life Insurance Fund Investment in China
2026-10-05
Literature
Koala. Beautiful Nothingness
2026-10-05