Installation Project Quality Acceptance Manual

Author: Cheng Xiuru
Publisher:
Publish Date: 2006-04-01
Features: This manual includes nine parts, such as pipeline installation engineering, electrical installation engineering, ventilation and air conditioning engineering, elevator installation engineering, steel structure engineering, general mechanical equipment installation engineering, industrial furnace masonry engineering, automation instrument installation engineering, and metal container engineering.

📌 Related Posts