Author: Jiang Xiaobing
Publisher:
Publish Date: 2006-02-01
Features: The Three Gorges Dam Project is a globally renowned large-scale engineering feat, which has undergone scientific exploration, survey and planning, meticulous design, and arduous implementation over several generations of Chinese people. The successful installation of the 700MW hydrogenerator unit marked a groundbreaking achievement. This book selects 454 images from tens of thousands of construction photos and hundreds of hours of video materials to showcase the external beauty of the electromechanical installation. It presents the installation process of the Alstom 700MW hydrogenerator unit in an illustrated format. These contents are organized into three main parts, covering the overall introduction of the Three Gorges Dam Project, the installation of each component of the turbine, and the overall assembly technology; as well as the installation of each component of the generator and the overall assembly technology. This book is suitable for technicians engaged in hydrogenerator unit installation for reference in their actual work, and can also be used as a learning resource for students and teachers in relevant disciplines at colleges and universities.
Installation Technology of 700MW Turbine-Generator Units in the Three Gorges
📌 Related Posts
News
What is the reason for a baby's knees bending when walking
2026-09-21
Literature
Typical application technologies for computer software and hardware optimization
2026-09-21
Literature
A Collection of Lyrical Songs for the Erhu
2026-09-22
News
What should a postpartum woman do if she has vulvar itching and greenish discharge?
2026-10-03
Literature
Television surveillance system engineering qualification tutorial
2026-10-04
Literature
Smart Building Low-Voltage Engineering Design and Implementation
2026-10-04
Literature
Clear Site Design
2026-10-04
Literature
Newly Edited Data Structures Tutorial
2026-10-04