Author: Huang Zijin
Publisher:
Publish Date: 2004-08-01
Features: This book is divided into 5 chapters. The first chapter briefly describes the basic methods for preparing project cost estimates and the functions of Excel in preparing project cost estimates. The second chapter introduces the "Water and Soil Conservation Project Preliminary Estimate Unit Tariff" and the "Construction Machinery Hourly Fee Tariff." Chapters 3 and 4 introduce the methods of using Excel to prepare preliminary estimates for water and soil conservation projects in development projects and for water and soil conservation ecological engineering projects. The fifth chapter briefly introduces the preparation of investment estimates, construction drawing budgets, and construction budgets. This book can serve as a reference for personnel preparing preliminary estimates and budgets for water and soil conservation projects, as well as a teaching material for on-the-job training. It can also be used as a reference for students and teachers of water and soil conservation engineering and hydraulic engineering majors in colleges and universities.
Cost Estimation of Soil and Water Conservation Project - Computerized Preparation
📌 Related Posts
Literature
Chinese High School Students' Material Composition New Hall
2026-09-24
Literature
Teng Zijing was exiled to govern Balin County
2026-09-25
Literature
Technical Management: Tutorial and International Cases
2026-09-14
Literature
Works of Hemingway -- Spring Tide
2026-09-12
Literature
Centennial Image of Chinese Women
2026-10-01
Literature
Yellow River Flood Control Project Modern Emergency Rescue Technology Research
2026-10-01
Literature
How to Do Well in Real Estate Marketing Consulting
2026-10-01
Literature
GPS positioning principle and technology
2026-10-01