Construction project progress control

Author: Wang Duanliang
Publisher:
Publish Date: 1999-02-01
Features: This book can be used as a textbook for supervising majors in higher education institutions, as a training manual for supervisors, or as a learning and reference material for personnel engaged in supervising work. The book consists of seven chapters, systematically introducing the methods, influencing factors, and handling of schedule claims for supervisors to conduct schedule control, covering topics such as an introduction to construction schedule control, CPM network plans, optimization of network plans, non-deterministic network plans, design stage schedule control, construction stage schedule control, and schedule claims.