Power Engineering Commissioning Technology Manual. Steam Turbine Volume: Steam Turbine Volume

Author: Henan Electric Power Company
Publisher:
Publish Date: 2003-04-01
Features: This book is divided into six parts and thirty-three chapters, mainly summarizing the basic knowledge of steam turbines, partial commissioning of steam turbine units, steam turbine commissioning during the entire start-up phase, typical unit commissioning cases, common faults and handling in steam turbine commissioning, and performance assessment tests for steam turbine unit start-up. Part I is the Basic Knowledge Part, which mainly introduces the classification of steam turbines, thermal power fundamentals in thermal power plants, and economic indicators of units, as well as the structure, regulation and security systems, and auxiliary systems of steam turbines. The second part is the Partial Commissioning Part, which mainly introduces the preparatory work before partial commissioning, the process of partial commissioning, and the regulation system tests. The third part is the Full Start-Up Part, which mainly introduces the basic content of steam turbine no-load, load-bearing, and full-load commissioning, steam turbine start-up guidelines, classification of steam turbine start-up methods, hot start-up, parameter monitoring, typical accident prevention measures, standards, and regulations. The fourth part mainly introduces typical unit commissioning cases at home and abroad. The fifth part is Common Faults and Handling During Commissioning, which mainly introduces the principles, general methods, and case studies of fault handling. The sixth part is Performance Assessment Tests for Steam Turbine Units, which mainly introduces thermal consumption tests of units, steam turbine maximum output tests (VWO conditions), steam turbine rated output tests, power consumption tests for steam turbine units, and shaft system vibration tests for steam turbine units.

📌 Related Posts