Author: Chief Editor of the former China National Petroleum and Chemical Corporation
Publisher:
Publish Date: 2001-07-01
Features: This quota is applicable to the installation engineering of various production medium transmission pipelines within the factory area of new construction and expansion projects, including workshops, units, stations, tank areas, and their interconnections, as well as the installation of factory water supply and drainage, steam, and gas transmission pipelines. The main contents include: pipeline installation, fitting installation, plate coil pipe fabrication and fitting fabrication, pipeline pressure testing, purging, and cleaning, non-destructive testing, and weld heat treatment, etc.
National Unified Installation Engineering Budget. Volume 6, Industrial Pipeline Engineering GYD-206-2000
📌 Related Posts
Literature
Children's Audiobook Treasury - One Thousand and One Nights
2026-09-13
Literature
Scream -- For the former rock of China: For the former rock of China
2026-09-20
Literature
Eternal Glory: Ancient Egyptian Civilization
2026-09-20
Literature
David of Sutherland
2026-09-20
Literature
Invincible English Grammar - Junior High Version
2026-09-20
Literature
Large Tank Foundation Design and Foundation Treatment
2026-09-20
Literature
Japanese Basic Course (1) Study Guide
2026-09-20
Literature
Here's the translation of the given content into English:
"Instant Use Business English Conversation Dictionary"
2026-09-20